2 x EV chargers, see pics,
Power Supply – 3 Phase
Install 2 . 3 phase, dual charger units 22kW on both containers.
Charger Location – 2 locations, dual chargers to be mounted on both containers as per photos.
Supply and install external mini-pillar next to existing meter cabinet, fixed to existing fence. 3 phase surge protection and breakers to be included.
Cable Run – from existing meter fuseboard at rear of containers, to a new mini-pillar. From new mini-pillar, new cable to run up existing light pole, and across to Container B via unistrut or tray equivalent. One cable to the dual unit on Container B, second cable to run to from Container B along another Unistrut to Container A. Allow 2 x 10m cables, both cables are to be 5 core, 16 square.
product proposed must be on SEAI’s Triple E register
request for similar project or reference
hikvision CCTV security for domestic house 3 bed, 4 cameras + apps + no recurring or monthly fees. imou doorbell camera must be wired . 1 x 8 way NVR Recorder 4 tb memory.
3 x HD IP Dome colour cameras with ir night vision.
1 x Monitor,
Cables power supply etc.
3 bed end of terrace approx. 100sqm.
Must be PSA Private Security Authority registered.
Power Flush. 2 Rads upstairs don't work ,7 rads in total, gas boiler about 5yo 3 bedroom semi detached ,just wondering if you could give me a quote, thanks
Boiler service Hi there my boiler pressure is really low and the flames won't ignite. We are in a 3 bed house and have a Mynute Vokera gas boiler. It is around 15 years old but as we are renting here cheap from my ex (long story) we don't plan on staying here so not intent on replacing the boiler. If we could just get through this winter would be great. I turned the boiler on in December and it worked fine all the rads heated up except the bathroom one. The next day the power came on but the flames would not ignite so no heat. Any info on prices etc would be great. I thought we might make it through the cold months without it but it's freezing. Thank you, Jackie Leddy
BER Cert 3 bedrooms 1 bathroom.. no attic conversion. Small granny flat. 1 bed 1 bathroom. Semi detached house. Electricity is prepay power. Bord Gas is heating & water
BER Cert Hi I need a BER cert for before and after a 4.5kwp Solar pv install for a local grant please. Unfortunately i need to have paper work submitted this month.
House is a bungalow(1981, 600sq ft.) detached with large extension built in 2003(additional 900sq. ft. Attic converted approx. 540sq. ft)
5 brdrooms, 3 bath, double glazed windows. Oil fired central heating. Extension is 6inch timber frameceith 6 inch fibreglass insulation in walls. 300mm fibreglass above ceiling upstairs.
Solar install will connect to.grid and divert any unused power to grid under micro-genwration acheme. No battery, no hot water heating.
Best regards
Richard
BER Cert 3 bedrooms 1 bathroom.. no attic conversion. Small granny flat. 1 bed 1 bathroom. Semi detached house. Electricity is prepay power. Bord Gas is heating & water
💡 Acceptance rate explained.. Users with a higher acceptance rate are more inclined to accept quotes. Lower acceptance rates generally represent tyre-kickers and don't attract highest rated pros. Just saying..
Hiring your vetted tradesman, at the best price, just got a whole lot easier
M
Daily active users
k
Quotes submitted & counting
We Value Your Privacy Your safety and privacy are important to us. We understand that sharing details like your exact address or whether your property has an alarm can feel sensitive. For the most accurate quotes, providing a precise location works best. If you prefer, you can give a general area, town, or neighborhood—just know that this may affect the precision of your quote. If you have any questions or need more information, feel free to reach out at dataprotection at quotelf dot com.
Top shELF pros
It's easy to see why users love Quotelf. With over 300 quotes accepted.. And a 12.5% quote acceptance rate, we've helped 100's of users to request & accept quotes, complete jobs on time, on budget, saving time and money.